The City and County of Denver’s Department of Transportation and Infrastructure (DOTI) is moving forward with a design and engineering project to eliminate gaps in sidewalks, improve drainage, and improve street infrastructure in the Mar Lee neighborhood. This project is part of a larger effort by the City to improve pedestrian safety and mobility.
STATUS: The new asphalt down into the cul-de-sac is a wonderful sight! As curb / gutter / sidewalk concrete progresses throughout the neighborhood, so will the placement of asphalt. Crews expect to finish up the inlets at Hooker Ct. this week. Fire hydrant work on the southeast corner of S. Hazel Ct. and W. Florida Ave. is complete and now the crews are working on curb / gutter / sidewalk prep along S. Hazel Ct to W. Florida Ave.
CURRENT TRAVEL & PEDESTRIAN IMPACTS: W. Iowa Ave. is open to local traffic, but watch for intermittent closures during the paving operations. S. Hazel Ct. is only open to local traffic as well during the prep work. Access to Hooker Ct. is being maintained during the inlet work with some minor impacts.
Pedestrian access on W. Iowa Ave. is open — as well as on S. Hazel Ct. — north of the intersection of W. Iowa Ave. and S. Hazel Ct. The pedestrian/bike detour of the Sanderson Gulch Trail is still in place.
This project is located in the Mar Lee neighborhood, specifically on S. Hazel Court between W. Florida Avenue and the Sanderson Gulch Trail as well as W. Iowa Avenue between S. Irving Street and Federal Boulevard. The project also includes a small segment on S. Irving Street just south of W. Florida Avenue.
Mar Lee RNO August Meeting Presentation This RNO Presentation features a project overview, photos of existing conditions, preliminary design, next steps and community outreach. Project Overview Board(PDF, 2MB) RNO Presentation(PDF, 3MB)
Community Pop-up Event A Community Pop-up event was held at the Sanderson Gulch Trail on August 28, 2021. Neighbors were notified by mail and invited to provide feedback on the project and preliminary designs.
WHEN: Construction starts the week of October 28, 2024. WHERE: The Mar Lee neighborhood / West Iowa Avenue and South Hazel Court WHAT: Improvements include a new underground storm sewer and inlets at the intersections of West Iowa Ave. and Hooker Street, and at West Iowa Ave. and S. Hazel Ct. Also included are new ADA curb ramps, and sections of new curb/gutter, and sidewalk for improved pedestrian access. Surface restoration — such as landscaping and paving for areas affected by the work — is included.
A new outfall will be constructed through the Sanderson Gulch / Irving Java Park, along with a trail connection starting from the S. Hazel Court cul-de sac.
Project Fact Sheet - English(PDF, 11MB) Project Fact Sheet - Español(PDF, 11MB)
Project Email:Sign up here to receive email updates from the Hazel & Iowa General Storm construction team. You can also email info@dotihazel.com with questions. Sign Up For Email Updates Project Hotline: (720) 677-0330Weekly updates will be recorded on this hotline — you can also call and leave a message or text this number to reach out to the project team.
Aaron McMichaelProject Manager, DOTIaaron.mcmichael@denvergov.org